SPACETIME=leaseProduct_01constructionProduct_02
Temporal risk intelligence for property, construction and capital contracts. SPACETIME turns complex documents into risk timelines, response options and version comparisons — so you can see when risk crystallises and whether changes actually improved the position.
SPACETIME.lease
High-fidelity risk mapping for institutional lease portfolios. Deterministic extraction of break options, repair obligations, rent reviews and 1954 Act status.
Enter platform →Product_02SPACETIME.construction
Deterministic modelling of JCT, NEC and bespoke construction contract suites. Managing technical exposure through the lifecycle of development.
Enter platform →Extract · Time-map · Respond · Compare
Platform logicRisk does not just live in documents. It moves through time, and it moves between versions. SPACETIME shows how — and whether changes actually reduced it, worsened it, moved it, or surfaced something new.
- 01
Extract
AI extracts clauses, dates, obligations and evidence from complex documents.
- 02
Time-map
Deterministic rule packs convert extracted facts into a risk timeline.
- 03
Respond
Structured playbooks show practical routes to manage, reduce, transfer, regear, exercise or monitor risk.
- 04
Compare
Versioned snapshots reveal whether changes reduced risk, worsened it, moved it or surfaced new risk.
"No clause without a clock. No risk without evidence. No risk without a route."
Deterministic Trace Methodology
- 01 / ExtractCL. 14.2 (a): “The Tenant shall be liable for all structural repairs to the Building Envelope…”
- 02 / Quote
“…liable for all structural repairs to the Building Envelope at all times during the Term.”
- 03 / RuleRULE CL-014 · IF repair_scope == structural & term_remaining < 24m → flag
- 04 / Risk CardCategory · Exit / CapExStructural repair exposure on short residueSeverity 4 / 5 · CL-014
Seven categories of lease risk
Taxonomy v0.1Date risk
Notice windows, expiry, renewal triggers.
Financial risk
Rent reviews, service charge, irrecoverables.
Control risk
Alienation, consents, security of tenure.
Compliance risk
EPC / MEES, statutory, building safety.
Exit risk
Breaks, dilapidations, reinstatement.
Evidence risk
Gaps, ambiguity, unverifiable extraction.
Strategic risk
Hold vs exit, restructure, optionality.
Seven categories of contract risk
Taxonomy v0.1Time risk
Programme delays, extension of time, liquidated damages, sectional completion.
Cost risk
Variations, price fluctuation, loss and expense, cost overruns, final account.
Quality risk
Defects liability, workmanship standards, materials, snagging, rectification.
Design risk
Design liability, novation, coordination, design development, change control.
Supply chain risk
Subcontractor default, retention, performance bonds, collateral warranties.
Regulatory risk
CDM, building safety, planning compliance, environmental obligations.
Resolution risk
Determination, dispute boards, adjudication, arbitration, final account lock-up.
Begin