System v0.1 · Risk Intelligence

SPACETIME=leaseProduct_01constructionProduct_02

Temporal risk intelligence for property, construction and capital contracts. SPACETIME turns complex documents into risk timelines, response options and version comparisons — so you can see when risk crystallises and whether changes actually improved the position.

Deterministic engineEvidence-ledAuditable trailNot legal advice
Product_01

SPACETIME.lease

High-fidelity risk mapping for institutional lease portfolios. Deterministic extraction of break options, repair obligations, rent reviews and 1954 Act status.

Enter platform
Product_02

SPACETIME.construction

Deterministic modelling of JCT, NEC and bespoke construction contract suites. Managing technical exposure through the lifecycle of development.

Enter platform

Extract · Time-map · Respond · Compare

Platform logic

Risk does not just live in documents. It moves through time, and it moves between versions. SPACETIME shows how — and whether changes actually reduced it, worsened it, moved it, or surfaced something new.

  1. 01

    Extract

    AI extracts clauses, dates, obligations and evidence from complex documents.

  2. 02

    Time-map

    Deterministic rule packs convert extracted facts into a risk timeline.

  3. 03

    Respond

    Structured playbooks show practical routes to manage, reduce, transfer, regear, exercise or monitor risk.

  4. 04

    Compare

    Versioned snapshots reveal whether changes reduced risk, worsened it, moved it or surfaced new risk.

"No clause without a clock. No risk without evidence. No risk without a route."

Deterministic Trace Methodology

  1. 01 / Extract
    CL. 14.2 (a): “The Tenant shall be liable for all structural repairs to the Building Envelope…”
  2. 02 / Quote
    “…liable for all structural repairs to the Building Envelope at all times during the Term.”
  3. 03 / Rule
    RULE CL-014 · IF repair_scope == structural & term_remaining < 24m → flag
  4. 04 / Risk Card
    Category · Exit / CapEx
    Structural repair exposure on short residue
    Severity 4 / 5 · CL-014

Seven categories of lease risk

Taxonomy v0.1
01

Date risk

Notice windows, expiry, renewal triggers.

02

Financial risk

Rent reviews, service charge, irrecoverables.

03

Control risk

Alienation, consents, security of tenure.

04

Compliance risk

EPC / MEES, statutory, building safety.

05

Exit risk

Breaks, dilapidations, reinstatement.

06

Evidence risk

Gaps, ambiguity, unverifiable extraction.

07

Strategic risk

Hold vs exit, restructure, optionality.

Seven categories of contract risk

Taxonomy v0.1
01

Time risk

Programme delays, extension of time, liquidated damages, sectional completion.

02

Cost risk

Variations, price fluctuation, loss and expense, cost overruns, final account.

03

Quality risk

Defects liability, workmanship standards, materials, snagging, rectification.

04

Design risk

Design liability, novation, coordination, design development, change control.

05

Supply chain risk

Subcontractor default, retention, performance bonds, collateral warranties.

06

Regulatory risk

CDM, building safety, planning compliance, environmental obligations.

07

Resolution risk

Determination, dispute boards, adjudication, arbitration, final account lock-up.

Begin

Map a lease or contract in under five minutes.

Deterministic engine · v0.1
Audit trail · ref 881F-A2

SPACETIME provides technical risk analysis based on encoded contractual logic. Outputs are evidence-led and deterministic. This does not constitute legal, financial or investment advice. Consult qualified professionals for specific advisory needs.